The build

We would rather show the work than promise a date

The building exists, it is leased, it is being fitted out. This page says where things stand. It is short for now, and that is normal: it grows as the work moves forward.

Why this page exists

A self-storage site under construction usually shows render images and an opening date. The images are pretty and the date keeps moving. We do the opposite: photos of what is actually built, and a deadline we correct instead of repeating.

If you join the list before opening, you are taking a risk. It might as well be a documented one.

Where things stand

The building
Leased and occupied. 1,800 m² right on the E42, split in two by a solid wall.
The depot half
In service. This is where the pellet pallets go out from.
The slab and the unit area
Concrete in place, area marked out, separate entrance identified.
Partitions and doors
Under way. This is the step that everything else depends on.
Aisle lighting
To be done, after the partitions.
Code-based access control
Ordered, to be installed after the partitions.
Cameras
To be done, after access control.
Opening to the first tenants
Announced on this page as soon as the doors lock, not before.

Last update to this list: at every step reached. If nothing has moved in a while, it means nothing has moved.

The photos

They are coming. Until we have a real photo of the build, we will not post one: a render image on a page called 'the build' would be exactly the one thing not to do here.